In 2014 BOS completed a total refurbishment of the swimming pool, installing two stainless steel water cannons and fitting an alkorplan pool liner.
We also installed brand new, state of the art, Razul mud bath, Sauna and Steam rooms, together with an Experience Shower. This project was highly commended by the judging panel at the 2014 Pool and Spa Awards.